Please be familiar with the details of the instruction before installation, circuit connection operation, preservation to guarantee the appropriate operation. At the same time, please be familiar with the situation of the cooperated facility and all the attention concerned with safety.
Around the HF equipment, 10 mm thick 35 KV voltage enduring board should be placed.
Don't touch the shell while operating.
While power off, the label signed with "Don't switch while power off and overhaul" must be hanged on the main power switch.
With the circumstance below 0℃, when the equipment ceases to run, the remained water in it must be discharged clearly by the compressed air to avoid damaging the element by freezing.
Halt water after 30 min of the welding machine turns off.
Please read the instruction carefully, comprehend every item of the content to ensure the correct installation, circuit connection and operation.
By the side of the solid state HF welder equipment, the breaker that used to protect the circuit and avoid electric leaking must be applied.
Be sure to connect with the ground wire.
Wiring must be processed by professional electricians.
Begin to operate the equipment after ensuring the power is off.
Don't touch the switch button by the wet or greasy hands.
Turn off all the power sources before overhaul, then discharge the condenses repeatedly by discharge stick, before begin to overhaul or change elements of the equipment.