• Check the induction coil and output leg connection is good, check the welded steel pipe and the induction coil is short circuit, and induction coil loop is open circuit or short circuit.
• Start the water cooling system, check that the water pressure is up to 0.2-0.3Mpa. Check if the water temperature is below 35℃.
• Check that the potentiometer is at zero positon, switch of rectifier unit is on external control. After the confirmation, started high-frequency welder, press the reset button, start the excitation control, start running control, start the main loop, and start heating. Adjust the speed control potentiometer and heating adjust potentiometer so that the production line meets the desired requirements.