+86-18630226696

Contact Us

    China

    CHINA

    ADD: ChaoYangNan Str, 300m to BaoCang Express Way Exit, BaoDing, HeBei, China

    TEL: +86-312-2090169/2090165

    FAX: +86-312-2090165

    Email: sales02@metowd.com

    Iran

    IRAN

    ADD: No.3 - Golshid9 St. - Nakhlestan Blvd. - Shams abad industrial Zone -40km Tehran Qom Freeway - Tehran - Iran

    Postal Code: 1834175977

    Tel: 00982156231607-8

    Mob: 00989121350509

    Email: atiravesh@yahoo.com

    Anahita-GmbH

    Germany Design & Development Office

    Germany Design & Development Office

    ADD: Wellensiek 111, 33619 Bielefeld Deutschland, Germany

    Tel: 0049 521 9890 170

    Mob: 0049 163 5149 622

    Email: amir.malek@anahita-gmbh.de
    s.malek@anahita-gmbh.de

Precautions for medium frequency furnace heating

Feb 02, 2023

1. Before the medium frequency furnace is opened, it is necessary to carefully check the electrical equipment, water cooling system, inductor copper tube and other components to ensure that these components can work normally. If there is any problem, it is forbidden to open the furnace.

2. When it is found that the furnace of the medium frequency furnace is seriously damaged and affects the normal operation, it should be repaired in time, and the melting process cannot be carried out in the furnace with relatively serious damage.

3. The use of medium frequency furnace should be in the charge of a special person. After the equipment is powered on and started, it is strictly forbidden to touch the inductor and cable. The operator on duty shall not leave the station without permission, and at the same time, carefully observe the external conditions of the inductor and crucible.

4. When loading the furnace charge, it is necessary to check the furnace charge. If it is found that the furnace charge is mixed with flammable and explosive substances, it is necessary to remove or replace the qualified furnace charge in time; In molten steel, cold and wet materials cannot be added directly; When molten steel is filled to the upper part, large pieces of material cannot be put in to avoid capping.

5. When repairing the furnace and tamping the crucible, iron filings and iron oxide shall not be mixed, and tamping the crucible shall ensure compactness.

6. During the pouring site and the pit in front of the furnace, ensure that there are no obstacles and water around to prevent the molten steel from falling and exploding.

7. The molten steel should not be too full. When the ladle is poured by hand, the operators should cooperate with each other tacitly and should not be impatient. After the pouring is completed, the remaining molten steel should be disposed according to the regulations and should not be dumped at will.

8. The workshop where the intermediate frequency furnace is placed shall be kept clean. Inflammable and explosive articles or other sundries shall not be placed in the workshop. Smoking is strictly prohibited.